Start with an estimate you can defend.

Clean numbers beat pretty slides. If you need a BOQ, a quantity take-off, or someone to hold the baseline, let's talk.

Cost that cannot be traced is not control. It is a guess written neatly.

Training Excel & P6

What I do now

Three tracks at once: employee, open for project work, and teaching engineers.

Open for cost work

Estimating, BOQ review, and project control for contractors, owners, or EPC teams that need numbers they can stand behind.

Freelance / contract

Training engineers

Founder of Kelasteknik.id. Primavera P6, SAP2000, and cost estimating for engineers who need to work, not just collect a certificate.

1,000+ engineers

Where I have worked

Cost Estimator

PT Asuka Engineering Indonesia · Gresik

General contractor across civil, mechanical, electrical, and instrumentation. Pre-bid lead on Coats Rejo, awarded at IDR 39 billion. Clients include Black & Veatch, FMC, and OTE.

Project Control Engineer

Mitraruma · Jakarta

40+ renovation projects at once. Baseline, vendor contracts, and spec QC. Rework down 60%.

Civil Engineer

PT Orecon Sadanus Perkasa · Bogor

Haul-road design, culverts, cut and fill, and the Canopy Galatama Kohod project in Tangerang.

On the next 5 years

I want to go deeper in Oil & Gas and EPC cost engineering, bring AACE discipline to energy projects, and keep Kelasteknik as a place where engineers learn tools they actually use on site.

How I work

Measure first

A loose take-off makes every rate behind it a lie. Quantity comes first.

Write the assumptions

An estimate without notes is an opinion. Assumptions, exclusions, and risk have to be visible.

Hold the baseline

A schedule or cost that is not locked cannot be controlled. Progress without a baseline is just a story.